The rumor is a 4 year plan to replace the entire track which would take 1 year/12 months and completed by 2027. @3month closure per year. I would not believe everything he says. 2025 is the 70th for DL most everything will be open. He also says the HM will open early. I would take a bet that it won't open early. I like him and watch his videos but he is not always very accurate. Also I recall the RR being closed for nearly 2 years as GEdge was being built -- huge refurb happened then in 2016/2017. We shall see.Fresh baked said he heard rumors that the railway will be closed for up to 3 months and will also have more similar closures in the future.he said they want to replace all the track and that is a 12 month process