vicarrieous
DIS Veteran
- Joined
- Feb 12, 2015
- Messages
- 1,792
Yea i dont believe this, they were not tearing any out
No but they could be hung up on supplies, materials or labor. We shall see. I sure hope its not delayed. Only time will tell.
Yea i dont believe this, they were not tearing any out
the supplies/materials could very well be it..... Know somebody that has been waiting 5 months now for matching dishwasher to their other appliances.No but they could be hung up on supplies, materials or labor. We shall see. I sure hope its not delayed. Only time will tell.
The same was true when we moved from Poly to non-refurbished room at BCV.If like SSR, and no reason to think they are different, they are going with very sturdy cushions to sit on. When we moved from SSR to a non-refurbished room at BCV we were shocked how much more comfortable and cushy the sofa sleeper couch was.
The only issue I have with the supply chain argument, is that even if the materials for the 4th floor are delayed, there should have been materials in the pipeline headed to BCV to meet the 3rd, 2nd, and 1st floor schedules, given the amount of work being performed per floor, and the generally assumed construction schedule. Long lead time items for the remaining floors should have been on their way even before work was started on the 5th floor. Construction materials typically fall into one of two categories: in-stock (or off-the-shelf) items, and MTO (made to order, or 'bespoke") items. We should assume that most of the materials Disney uses are MTO, at least as far as the soft goods/textiles are concerned and those take months to design and manufacture/print/loom, but it's a soft goods refurb only so we're not talking about complete suites of furniture, "just" the Murphy beds. Once you run an order, you keep running it until it's done.the supplies/materials could very well be it..... Know somebody that has been waiting 5 months now for matching dishwasher to their other appliances.
YES! Thank you! Please give any/all updates you have and photos of a 1bedroom!We are checking into a 4th floor 1-Bedroom tonight. So we should know in a few hours if the 4th floor is completed or delayed. I promise to do some sleuthing for everyone this weekend!
Any update?We are checking into a 4th floor 1-Bedroom tonight. So we should know in a few hours if the 4th floor is completed or delayed. I promise to do some sleuthing for everyone this weekend!
Lol. Give them the couple hours they mention - barely gave them 30 minutes.Any update?
some things like businesses going out of business overnight happen. I have paper coming from Finland for my company and it isn't moving at all because of the transport strike. Ship, rail and truck transport all stopped due to strike. Things happen.The only issue I have with the supply chain argument, is that even if the materials for the 4th floor are delayed, there should have been materials in the pipeline headed to BCV to meet the 3rd, 2nd, and 1st floor schedules, given the amount of work being performed per floor, and the generally assumed construction schedule. Long lead time items for the remaining floors should have been on their way even before work was started on the 5th floor. Construction materials typically fall into one of two categories: in-stock (or off-the-shelf) items, and MTO (made to order, or 'bespoke") items. We should assume that most of the materials Disney uses are MTO, at least as far as the soft goods/textiles are concerned and those take months to design and manufacture/print/loom, but it's a soft goods refurb only so we're not talking about complete suites of furniture, "just" the Murphy beds. Once you run an order, you keep running it until it's done.
At most, you would expect that things should only be delayed a few weeks. If a key supplier managed to only ship enough material to complete +/- 1/5 of the project and everything else is months out, there's no way Disney didn't know long ago, and that's a HUGE issue and I'd bet dollars to donuts that someone is heading deep into liquidated damages.
I'm just going off nearly 40 years in construction as a general contractor and project manager.some things like businesses going out of business overnight happen. I have paper coming from Finland for my company and it isn't moving at all because of the transport strike. Ship, rail and truck transport all stopped due to strike. Things happen.
Can confirm, our 4th floor 1BR is refurbished! All new carpet in the 4th floor hallways too. Will take and post photos in the morning.We are checking into a 4th floor 1-Bedroom tonight. So we should know in a few hours if the 4th floor is completed or delayed. I promise to do some sleuthing for everyone this weekend!
I will take the word of people actually staying at the resort over these people speculating and acting like they know... Someone just commented the 4th floor is open and fully refurbished, so those saying its delayed are just wrongI'm just going off nearly 40 years in construction as a general contractor and project manager.
Good News! I think we can finally put this on the list of dont believe things we read on the internet! The original post that started this speculation by "Carl Wong" saying the 4th floor wasnt opening because of issues is clearly wrong as we now have people staying on said floor! Im not worried about an entire floor not going offline yet beacuse we dont know whats going on in individual rooms. This isnt a refurbishment where they woud have to take entire floors offline (until they are replacing the carpet which would be the final step).No but they could be hung up on supplies, materials or labor. We shall see. I sure hope its not delayed. Only time will tell.
Can confirm, our 4th floor 1BR is refurbished! All new carpet in the 4th floor hallways too. Will take and post photos in the morning.
Yay! Thanks for sharing!Can confirm, our 4th floor 1BR is refurbished! All new carpet in the 4th floor hallways too. Will take and post photos in the morning.
Hey there. Look forward to your photos - especially of the Murphy bed in the 1BR - curious if it has the side chaise similar to BRV. Would like to see if 3 kids could sleep in it in a pinch.Can confirm, our 4th floor 1BR is refurbished! All new carpet in the 4th floor hallways too. Will take and post photos in the morning.
Kinda what I expected, to be honest.I will take the word of people actually staying at the resort over these people speculating and acting like they know... Someone just commented the 4th floor is open and fully refurbished, so those saying its delayed are just wrong
That’s what it sounds like from the post. I can’t figure out how to link a specific Facebook post here or I would. It was posted 6 days ago.