i12go2wdw
DIS Veteran
- Joined
- Jul 3, 2001
- Messages
- 539
We are going Aug.23 to Sept 6, 14 wonderful days. Today was my 180 days out mark so I was able to book up to Sept. 1 (180 +10) can I book for Sept.
2nd tomorrow and 3rd the next day or do I need to wait for 180 days from Sept. 2nd. I know I had the same problem last year trying to do it and ended up having to talk to a supervisor which left me feeling like I was trying to get away with something,but I was able to do it. Does anyone know the policy on this?
Thanks
2nd tomorrow and 3rd the next day or do I need to wait for 180 days from Sept. 2nd. I know I had the same problem last year trying to do it and ended up having to talk to a supervisor which left me feeling like I was trying to get away with something,but I was able to do it. Does anyone know the policy on this?
Thanks
Ask the first CM to get the Supervisor and explain your situation. Do it first thing! Let them know that you have everything ready and that you want to make all the ADRs right now. Be polite and do not waiver, good things will happen! Otherwise you can wait the extra 4 days untill your entire trip will be covered.