lockedoutlogic
DIS Veteran
- Joined
- Apr 26, 2007
I think the "combo" train was and still is in Incredibly poor taste...
Not because it was a repaint and duct tape job on something that had a fatality...though that was bad...
Those trains are a symbol of the operation... And of a incredibly lucrative segment of the operation...of a filthy rich corporation...
That is kissing the butt of the Chinese government...and spend 3 times as much money as the trains would cost to push through every bad idea for a movie in the hopes of selling junk at walmart...
And they just can't swing it to serve $100 tickets and $450 rooms.
It's pathetic. When that accident happened... The new trains should have been put into production right then.
Not because it was a repaint and duct tape job on something that had a fatality...though that was bad...
Those trains are a symbol of the operation... And of a incredibly lucrative segment of the operation...of a filthy rich corporation...
That is kissing the butt of the Chinese government...and spend 3 times as much money as the trains would cost to push through every bad idea for a movie in the hopes of selling junk at walmart...
And they just can't swing it to serve $100 tickets and $450 rooms.
It's pathetic. When that accident happened... The new trains should have been put into production right then.