04-06-2001, 11:25 PM
...was partitioned off last Saturday. Anyone know if it's maintenance or something being added?
Jim

CoasterFEV
04-07-2001, 06:18 AM
Just routine maintenance.

There was a number of problems with the old surface of the bridge. Colors were bad - plus the biggest problem was the strength of the old surface. In fact, the old surface was cracking and falling to pieces.

So, the Toon Bridge is getting a new surfacing. Just like the highway department does to road bridges. The concrete was removed down to the supports, and a new surface has been poured - which looks ALOT better and will last much longer than the old one.

The whole bridge should be back open in the next few days.

IOATech
04-07-2001, 08:55 AM
You have nailed it. The Toon Bridge project wrapped up last night. Surface work is done and the fence is down, bridge is fully open as of this morning.