02-22-2010, 10:41 AM
Fort Wilderness Resort & Campground Loops 400 thru 1400, 2000, 2100 – removal and replacement of roof.
(I'm assuming they are speaking of comfort stations or bus stop awnings)
Fort Wilderness Resort & Campground roundhouse – recoating of roof.
lklasing
02-22-2010, 10:57 AM
Eek! Did it say when that is going to be happening? We're there March 12-18 and have requested loops 1100 (for the camper) and 2100 (for the cabin), so we can be as close together as possible. That info makes me wonder if both those loops will be out of commission while we're there. :confused:
Old Surfer Dude
02-22-2010, 02:26 PM
We were at the fort last week and the 2100 loop was closed for refurbishing.
clkelley
02-22-2010, 03:53 PM
Eek! Did it say when that is going to be happening? We're there March 12-18 and have requested loops 1100 (for the camper) and 2100 (for the cabin), so we can be as close together as possible. That info makes me wonder if both those loops will be out of commission while we're there. :confused:
If it is truly the comfort station roofs, it should only take a day or two to replace each roof.
lklasing
02-22-2010, 05:00 PM
I'm going to cross my fingers that both loops are open when we get there. It would be so great if our loops backed up to each other (and even better if our sites backed up to each other)!